This project started in 2017, and is located right next to the spectacular RIU Helis Paradise. Also a large-scale project with its features. We were invited to participate in a tender for the implementation of twenty-six refrigeration installations and installation of kitchen and bar equipment in all major themed restaurants located in the complex.
Category:
Hotel * * * * *Project type:
Installation and service of all refrigeration systems Installation and service of complete bar and kitchen equipment.Execution time:
Four monthsInteresting facts
- Over 1450 square meters of cooling panel.
- 485 meters pipeline for power supply of refrigeration systems on two floors.
- Provided cold production for low and medium temperature cooling with centralized units.
- Save 35% on electricity costs.
- Installation and integration of the most modern kitchen equipment.
Gallery
Other projects
Send inquiry
Send your inquiry and our consultants will contact you as soon as possible